I started a project last fall, building a 36x30 steel arch building on our lot in Arizona. I was overly optimistic how much work it would take, and just how much my old body could still handle. So, heading into March, and with several planned trips ahead of us (including a Ryde-In or two), I wasn't sure we could finish by the time we leave here the end of April.
Sheltering in place for most of March and all of April, with all trips canceled, staying off Nextdoor and Spyderlovers, I was able to get it finished.
Now we're ready for next winter, which should be 90% play time.

Sheltering in place for most of March and all of April, with all trips canceled, staying off Nextdoor and Spyderlovers, I was able to get it finished.
Now we're ready for next winter, which should be 90% play time.


