Northofthesix
Member
I picked mine up Wednesday; they had it about a week and a half, took them 13 hours labour (told me I was the second they did, first one took 23 hours) so they are pretty pissed at BRP for shorting them so much on their actual costs. Interesting that they changed transmission fluid and coolant as part of the recall, but I had to pay for the oil change as BRP has told them it is not required... or they saw that as a way to scratch back some of the extra costs BRP won't cover. Rode it home (30 kilometers) in 2°C weather with rain, and crosswinds nearly ripping my head off... but I got to ride "The Goblin", so all in all, a good day!