Rednaxs60
New member
Have a list of work to be done before the touring season hits. My other thread: Initial Maintenance and Work from when I bought the Spyder last year is getting a bit long in the tooth - https://www.spyderlovers.com/forums/showthread.php?139335-Initial-Maintenance-and-Work The second is on suspension: https://www.spyderlovers.com/forums/showthread.php?141448-Suspension
My list for February/March:
Dash Mount - thinking the TricLED - has 3 - 1" ram mount balls and 5 locating postions.
Accessory fuse block
Trailer wiring harness install
Trailer connector install
Front/rear shock spring change
Front trunk release check - spring action no longer works
Rear tire replacement - original 2014 tire still on
Oil/filter change will be done in May
Garmin Zumo 660 install
Quadlock cell phone bracket install
Probably more but this is a good start.
My list for February/March:
Dash Mount - thinking the TricLED - has 3 - 1" ram mount balls and 5 locating postions.
Accessory fuse block
Trailer wiring harness install
Trailer connector install
Front/rear shock spring change
Front trunk release check - spring action no longer works
Rear tire replacement - original 2014 tire still on
Oil/filter change will be done in May
Garmin Zumo 660 install
Quadlock cell phone bracket install
Probably more but this is a good start.