Is anyone else in the Phoenix area having a problem with RideNow getting their DPS installed? I have been on the list since September and have finally made it to fifth place after having been told that I was in third place a month ago. According to their timetable it takes about a week to do one install with the turn around for a replacement unit from BRP, so I may get mine in January, unless their clock continues to run backwards.