PDA

View Full Version : RT SE5 Floorboards



sealfloorboards
09-07-2010, 09:46 PM
Hi all,

Yesterday (Labor Day) I did the final fitting of the RT SE5 Seal FloorBoard. Looks and works great. We will begin production tomorrow and should be ready to ship in about 2 weeks. Installation is even easier than the RS model, only three bolts per side. I'll have photos next week when the kind RT owner return from a business trip.

Keep you posted,

John
Seal FloorBoards

canam9
09-07-2010, 10:11 PM
:popcorn: :ani29:

stillriding
09-08-2010, 09:07 AM
Hi all,

Yesterday (Labor Day) I did the final fitting of the RT SE5 Seal FloorBoard. Looks and works great. We will begin production tomorrow and should be ready to ship in about 2 weeks. Installation is even easier than the RS model, only three bolts per side. I'll have photos next week when the kind RT owner return from a business trip.

Keep you posted,

John
Seal FloorBoards

I'm really looking forward to seeing the results of your efforts. One question: will they be strong enough to stand on to mount the Spyder for those of us who are "horizontally challenged?"

sealfloorboards
09-08-2010, 10:21 AM
I'm really looking forward to seeing the results of your efforts. One question: will they be strong enough to stand on to mount the Spyder for those of us who are "horizontally challenged?"

Hi stillriding,

Great question. The owner of the RT I'm working on is 6'6" and well over 300 lbs. He stepped onto them and mounted his bike with no problem. I'll have to say the RT groaned but the my Seal FloorBoards took it in stride. They are made of 3/8" steel and sit on the foot pegs. Thanks for your interest. Keep watching, I'm working as fast as I can. It's up to the steel fabricators and powder coaters now.

Best wishes,

John
Seal FloorBoards

stillriding
09-08-2010, 12:41 PM
Thanks John. Glad to hear it.